Customization: | Available |
---|---|
After-sales Service: | 1 Year |
Warranty: | 1 Year |
Still deciding? Get samples of US$ 0/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Application |
Pipe Fittings |
Material |
Stainless Steel |
Surface Preparation |
Shot Blasting |
Standard |
DIN 1/8''-4'' |
Packaging |
Carton Box and Pallet |
Origin |
Zhejiang, China |
STAINLESS STEEL PIPE FITTINGS DETAILS | |
Material | High quality stainless steel AISI 201 304,316,304L,316L |
Standard | ANSI,DIN,JIS,BS |
Thread | NPT,BSP,BSPT,DIN2999 |
Size | 1/4''-8'' |
Model | Elbows, Tees, Nipples, Unions, Bushings, Plugs etc. |
Technics | Casting,Welding |
Connection | Male, Female, Welded |
Shape | Equal, Reducing |
Certificate | ISO9001 |
Buyer's drawings or designs are available. | |
Package | 1. Cartons without pallets. |
2. Cartons with pallets. |
Are you factory or trading company? |
We are factory located in WenZhou city, China |
What kinds of language is avaliable? |
English, Chinese, except email. |
May I have free samples before ordering? |
Yes,free samples can be provided. |
What is the lead time |
5-7 days for usual items in stock |
How should I place an order? |
We are receive the PO and production drawing by email. |
What's the payment method? |
T/T and L/C. |
Do you have product warranty? |
Yes,12 months warranty.100% inspection on finished products before dispatch. |
Do you accept customizing? |
Custom facbrication is acceptable. |
How can I contact you? |
You can contact us by email. |
Which packing material do you use for the sea shipping? |
For sea shipping,we will packaging standard wooden pallet.The parts will packing with carton box. |
How do you deal with the RFQ? |
Sales receiving the RFQ--Feasiblity study meeting with R$D engineer--Feed back technical issues with Customer--Sales quoted. |